Air Handling Unit 21
Location
Next to mosque -ME ROOM
Status
Operational
Priority
P4 - Monitor
Condition grade 3
Fair
1
2
3
4
5
FINDINGS & RECOMMENDED ACTION
- Unit is operating at 55 Hertz. - Airflow > 8500 m³/h > 2.36 m³/s > 5021 CFM - Actual airflow > 4490 CFM > 2.1 m³/s - PSYCHOMETRIC CALCULATIONS: READINGS AT Pre-coil Temp & % RH; 25.2 Celsius @ 25% RH: Dry-bulb(Input) 25.2 °C RH(Input) 25.0 % Humidity ratio 4.96 g/kg Enthalpy 38.0 kJ/kg Wet-bulb 13.6 °C Dew point 3.8 °C Specific volume 0.852 m³/kg Density 1.180 kg/m³ Vapor pressure 802 Pa READINGS AT Post-coil temp & %RH’; 14.9 Celsius @ 43.7% RH: Dry-bulb(Input) 14.9 °C RH(Input) 43.7 % Humidity ratio 4.58 g/kg Enthalpy 26.6 kJ/kg Wet-bulb 8.8 °C Dew point 2.7 °C Specific volume 0.822 m³/kg Density 1.222 kg/m³ Vapor pressure 740 Pa Calculations: Total cooling = (2.1 m^3/s) * 1.2 kg/m^3 * (38 kj/kg - 26.6 kj/kg ) = 28.7 kW / 3.517 = 8.2 TR Sensible cooling = (2.1 m^3/s) * 1.2 kg/m^3 * (25.2 CELSIUS - 14.9 CELSIUS) = 26.0 kW / 3.517 = 7.4 TR Latent cooling = Total cooling - Sensible Cooling = 0.8 TR FINDINGS: 4,468 CFM / 8.2 TR = 544.9 CFM/TR 544.9 CFM/TR is quite high and above the comfort ASHRAE rule of thumb of 350-400 CFM/TR - Unit is suspected to have lost its design performance of cooling along other defect components such as belt drive system and heaters.
Technical Details
- System
- Mechanical
- Category
- Air Handling Unit
- Manufacturer
- Carrier
- Model
- 39FD350
- Serial Number
- 881963
- Location
- Next to mosque -ME ROOM
Documents
0No documents attached.
Need to update this asset?
Sign in with your technician or administrator account. Your name and every changed field are added to the asset history.