AtharAssetAsset Record
ATH-000585ALS

BMS DDC-06

Location

Al-Salam Main Building

Status

Non-Operational

Priority

P2 - Planned

Condition grade 4

Poor

1

2

3

4

5

FINDINGS & RECOMMENDED ACTION

- Internal wiring is poorly organized, with excessive loose cables. - Dust accumulation observed inside the enclosure. - Electrical terminals and control modules appear securely mounted. - No visible signs of overheating or burnt components. - Panel enclosure structurally intact. - BMS system currently under renovation; full operational status not confirmed.

Technical Details

System
ELV
Category
Building Management System
Manufacturer
—
Model
DDC
Serial Number
14/J100B-06
Location
Al-Salam Main Building

Documents

0

No documents attached.